Summary

With extensive experience as the Principal Control & Instrumentation Engineer on the BP Unmanned Shah Deniz Compression Platform Project, I have developed a strong proficiency in designing, implementing, and commissioning control systems. As the Controls & Instrumentation Lead Engineer on the UBOC project, I effectively managed a team of engineers, ensuring the achievement of project milestones within established baselines. These experiences have fueled my desire to expand my skills in project management, leading me to enroll in a PMP course. Furthermore, I am actively pursuing IET Chartered Engineer status to further enhance my engineering expertise. Going forward, my objective is to leverage my engineering knowledge and teamwork abilities in future projects. I am committed to delivering high-quality outcomes and contributing to the success of my company through effective project management and leadership.

Overview

27
27
years of professional experience

Work History

CONTROL AND INSTRUMENTATION PRINCIPAL ENGINEER

SOCAR-KBR
Baku, Azerbaijan
01.2019 - Current
  • Assisted customers on-site during project construction and commissioning stages, providing technical clarifications and solutions to controls and instrumentation activities by responding and providing solutions to technical engineering queries (incorrect material use, missing termination details, etc.).
  • Effectively communicated with vendors, including Emerson, ABB, Autronica, Siemens, Krohne, Endress+Hauser, Powell, and Tracerco, to address technical issues with vendor-supplied packages, ensuring resolution and collaboration.
  • Delivered instrument and control scope on packages X-Mas Tree and Wellhead HPU Control System, Flash Gas Compressor packages, Pump, and Separators.
  • Worked extensively with various engineering documentation, including specifications, philosophies, Fire & Gas (F&G) and Emergency Shutdown (ESD) Cause & Effect diagrams, control narratives, Process Control System (PCS) documentation, IO schedules, alarm and trip schedules, cable schedules, block diagrams (BLDs), electrical termination diagrams (ETDs), instrument location diagrams (ILDs), loop of panels (LOP), and instrument datasheets throughout the project lifecycle.
  • Participated in the selection of process measuring instrumentation, including pressure, temperature, flow, and level transmitters, various types of flowmeters, and control and ESD valves, ensuring optimal performance and compatibility.
  • Prepared detailed data sheets for specified devices, including pressure, temperature, level, flow transmitters, and control valves, ensuring all specifications were accurately captured.
  • Successfully raised Project Change Notices (PUNs), Construction Change Notices (CCNs), and Commissioning Engineering Change Notices (CECNs) to document and execute technical modifications during the commissioning process.
  • Completed material take-offs for junction boxes, cables, glands, tubes, and fittings, ensuring accurate inventory and procurement processes.
  • Demonstrated proficiency with electrical diagrams, control systems circuits, critical systems operations, industrial HVAC, and power management systems, enhancing project execution and operational efficiency.

SENIOR CONTROLS INSTRUMENT ENGINEER

Rapid Solutions Ltd
Baku, Azerbaijan
06.2018 - 06.2019
  • Involved the comprehensive delivery of Electrical and Instrumentation (E&I) engineering drawings, including loop sheets: Created detailed loop sheets to ensure accurate representation of control systems.
  • Electrical Termination Diagrams (ETD): Developed ETDs for clear electrical connection guidelines.
  • Schedules: Maintained project schedules for timely completion of tasks and deliverables.
  • Datasheets: Prepared datasheets for instruments, detailing specifications and operational parameters; hook-up diagrams to facilitate proper installation and connections.
  • Block Diagrams: Developed block diagrams to illustrate the overall system architecture and functionality.
  • Delivered redline/Greenline as-built drawings to the customer, accurately reflecting the completed scope of projects. This ensured clear communication of modifications and provided a reliable reference for future operations and maintenance.
  • Identified both construct and destruct scopes of the project, assessing requirements for project execution.
  • Managed material ordering processes, ensuring that all necessary components were available for timely project execution while adhering to budget constraints.

INSTRUMENT / CONTROL SYSTEM COMMISSIONING ENGINEERING

BP
Baku, Azerbaijan
01.2013 - 10.2017
  • Ensured availability of the following approved documents: ICSS GA drawings, System Architecture drawings, Network interconnection, Power wiring and distribution, Earthing wiring drawings, Functional design Specification for ICSS, I/O list, Instrument list, Bill of Material, Cable termination schedule, P&ID Drawings, Control narrative/process description, logic diagram, FAT Reports, etc.
  • Utilized instrumentation tools Tester, Digital Multimeter, Insulation resistance tester, 4-20 mA source, HART communicator, Loop check tester, to carry out instrument and control loop checks.
  • Ensured UPS (redundant) and non-UPS (utility) power supplies are available. Before charging any commissioning ICSS and field checks. Operators' workstations (OWS), Engineering workstation (EWS), HMI and Antivirus are ready with installed software as per system requirement, and the latest backup of FAT logic and graphics configuration is available.
  • Verified all equipment and instruments are mechanically completed before starting any commissioning activities. Oversaw installation of instrumentation and control systems, ensuring that all components are installed according to the design specifications.
  • Constantly accessed to Marshalling, power distribution, and Charm Cabinets and carried out related panel alarm tests and troubleshot process control system (PCS), process shutdown system (PSD), safety instrumented system (SIF), fire and gas (F&G) loop test, redundancy, graphic, logic, cause and effect, asset management, alarm rationalization, partial stroke testing, and HART multiplexer (master and slaves) systems to ensure they meet safety standards and function properly.
  • Carried out partial stroke tests on both the solenoid and positioner for the SIS shut-down valves, trended the reading, and attached it to the related inspection test record to approve the valve successfully performing its intended function.
  • Performed Safety Instrumented System-related field instrument inspections and commissioning to make sure the SIL is achieved according to the IEC61508 and IEC61511 standards with the allocated SIF.
  • Carried out all necessary actions to ensure control and instrumentation systems are installed correctly, and performed checks to confirm that power supplies, communication links, and other critical connections are functioning as intended.
  • Detected and addressed issues or discrepancies that might not have been evident during factory testing or earlier phases. Record issues and discrepancies for resolution.
  • Performed walkdown on systems to do punch listing for installation defects and deviations from the project standards and documentation.
  • Identified and resolved issues or discrepancies encountered during testing and commissioning.
  • Carried out dynamic and static process checks by adhering to the commissioning test procedures with the assistance of the Emerson ICSS Engineer support.
  • Carried out PSD and F&G cause and effect dynamic check and verification between the field and main control operation workstation/ICSS. Utilized overrides or interlocks were required to carry out the test in a safe manner, not disturbing other interrelated commissioned systems.
  • Recorded changes in assigned drawings, documents, and configurations through the marking up for as-built documentation and closed out an outstanding open punch list item.
  • Provided ongoing support to resolve any technical issues or questions that were raised during commissioning.

CONTROLS / INSTRUMENTATION COMMISSIONING ENGINEER

BP / Swift Technical
Baku, Azerbaijan
06.2011 - 07.2013
  • Led the commissioning of critical facility systems, including Fire and Gas (F&G) systems, process control loops, and emergency shutdown loops, while providing technical troubleshooting to ensure optimal performance.
  • Performed functional checks on F&G detectors, extinguishing/deluge release systems, water mist protection systems, and fire water pump status and alarms, verifying proper operation and safety compliance.
  • Participated in Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT) for various packages, ensuring all systems met design specifications and operational requirements.
  • Conducted partial stroke testing on control valves to verify functionality and safety, ensuring that control mechanisms operated as intended.
  • Performed serial Modbus link checks between package PLCs and the Distributed Control System (DCS), ensuring reliable communication and data transfer.
  • Carried out serial communication checks between the vendor packages and ICSS Modbus, Fieldbus, Profibus, HART, and wireless communication protocols by utilizing physical layers of fiber optic, Cat6a, and hardwired cable. Troubleshoot any communication defects and inconsistencies.
  • Managed 'as-built' documentation in compliance with project procedures, ensuring all changes and installations were accurately recorded and accessible.
  • Ensured that all static and dynamic instrument commissioning tasks were accomplished safely, adhering to safety protocols and industry's best practices.
  • Oversaw the completion of all instrument commissioning processes and certifications, facilitating a smooth transition of systems to operations.
  • Reviewed and tested commissioning test procedures to confirm their adequacy and effectiveness for system validation.
  • Utilized loop drawings and datasheets to test field instrumentation, Integrated Control and Safety Systems (ICSS), and fire and gas systems, ensuring full operational readiness.
  • Demonstrated proficiency with communication protocols such as Foundation Fieldbus, Profibus, HART, and Modbus, enhancing system integration and communication efficiency.
  • Actively attended commissioning meetings to discuss progress, address issues, and align team efforts for successful project completion.
  • Conducted F&G and Process Shutdown (PSD) cause and effect tests to verify system responses and safety mechanisms, ensuring compliance with safety standards.
  • Worked with Safety Instrumented System (SIS) devices and completed Safety Instrumented Functions (SIF) loops, ensuring all safety requirements were met.
  • Conducted thorough testing of commissioning test procedures, validating their effectiveness and reliability in assessing system performance.

CONTROLS / INSTRUMENTATION ENGINEER

BP
Baku, Azerbaijan
02.2002 - 10.2009
  • Verified loop function checks on ABB Integrated Control and Safety System (ICSS) faceplates, ensuring proper operation and integration of control loops.
  • Ensured that all commissioning replacement parts and consumables were identified and procured in a timely manner, facilitating uninterrupted commissioning operations and minimizing delays.
  • Managed construction-completion certification in accordance with the completion certification management system (GOC), ensuring all necessary test certificates and test reports were completed and compliant before transitioning to commissioning to operation.
  • Assisted in troubleshooting during commissioning and post-startup phases, addressing any control and instrumentation issues promptly to ensure system reliability and performance.
  • Ensured that all punch lists and engineering technical queries were addressed and closed out prior to the transfer of operations, facilitating a smooth handover and operational readiness.
  • Worked extensively with project commissioning documents, including loop drawings, cause and effect diagrams, control narratives, IO schedules, alarm response manuals, datasheets, PIDs, and process Update Change Notices.
  • Ensured and carried out loop performance checks and tests as per the project documents, loop drawings, datasheets, and alarm setpoints.
  • Reviewed and validated cause and effect diagrams for safety and operational clarity.
  • Contributed to control narratives that outlined operational logic and sequences.
  • Maintained PCS, PSD, and F&G IO schedules to ensure comprehensive coverage of all control points and updates.
  • Assisted in the development of alarm and response manuals.
  • Reviewed and updated datasheets for all instrument devices and on-off, modulating control devices.

INSTRUMET SPECIALIST

SOCAR
Baku, Azerbaijan
08.1998 - 03.2002
  • Led the installation and integration of various instrumentation systems, ensuring operational efficiency and adherence to project timelines.
  • Conducted routine and ad-hoc calibrations of measurement instruments to maintain compliance with industry standards, ensuring data accuracy and reliability.
  • Performed scheduled maintenance and diagnostic troubleshooting on instrumentation to identify and resolve issues swiftly, minimizing equipment downtime.
  • Maintained comprehensive records of instrument specifications, calibration data, and maintenance logs, ensuring compliance with internal and regulatory audit requirements.
  • Ensured all instrumentation adhered to relevant safety, regulatory, and industry standards, contributing to overall operational safety and reliability.
  • I worked in partnership with multidisciplinary teams, including engineers and technicians, to optimize instrument performance and facilitate the integration of new technologies.
  • Developed and delivered training programs for operators and technical staff on the effective use and maintenance of instrumentation systems.
  • Engage in continuous professional development to stay updated on emerging technologies and best practices in instrumentation.
  • Strictly adhered to safety protocols and procedures, particularly in high-risk environments, promoting a culture of safety awareness.
  • Successfully performed comprehensive checks and tests of serial data communication between vendor package PLCs and the SCADA/Integrated Control and Safety System (ICSS).
  • Ensure reliable data exchange and system integration, identifying and resolving communication issues to enhance system performance.
  • Reviewed and validated as-built documentation against construction and commissioning markups to ensure accuracy and compliance with design specifications.
  • Engaged with project teams to confirm that all modifications were properly documented, facilitating smooth project handover.
  • Selected, installed, and tested a variety of instruments and control devices, including pressure transmitters, temperature transmitters, flow transmitters, level transmitters, and control valves.
  • Conducted regular inspections, calibrations, and testing of instrumentation and control systems to maintain optimal performance and compliance with industry standards.
  • Collaborated with cross-functional teams, including engineers and project managers, to ensure effective integration of control systems and instrumentation.
  • Prepared detailed reports on testing results, maintenance activities, and calibration findings, contributing to continuous improvement and operational excellence.

Education

Bachelor of Science - ENGINEER / AUTOMATION

Azerbaijan State Oil and Industry University
01.1998

Projects Achievements

  • SDC: Shah Deniz Compression Project, Shah Deniz Compression (SDC) is an electrically powered, normally unattended installation (eNUI). It is a compression platform with electrically driven compressors controlled remotely. The platform will be located approximately 3 km north-west of Shah Deniz Bravo (SDB) in circa 85 meters. The compression systems are sized to match the design capacities and terminal arrival pressures of Shah Deniz Alpha (SDA) and Shah Deniz Bravo (SDB). The facility will use hermetically sealed HOFIM compressors with variable speed drives (VSDs) to minimize compressor ancillary systems. The SDC platform will import electricity via a High Voltage Alternating Current (HV-AC) power cable from the onshore Sangachal Terminal (ST)., 2023, Current
  • ACE-Azeri Central East Project, The ACE project is one of the giant Azeri-Chirag-Gunashli (ACG) fields in the Azerbaijan sector of the Caspian Sea. It is a $6 billion development project that includes a new offshore platform and facilities designed to process up to 100,000 barrels of oil per day., 2019, 2023
  • SHAH DENIZ ALPHA & BRAVO Project / COP Project, Shah Deniz Stage 2, or Full Field Development (FFD), is a giant project that will add a further 16 billion cubic meters per year (bcma) of gas production to the approximately 10 bcma produced by Shah Deniz Stage 1. The Chirag Oil Project (COP) is a $6 billion further development plan for ACG. Over $4 billion of the total project capital expenditure has been used in the construction of facilities and the pre-drill programme, and the balance of the sum will be spent on the platform development well drilling during the production period. This major investment will contribute to optimizing recovery from the ACG field., 2011, 2017
  • STEP Sangachal Expansion Project, Located 55 km south of Baku, the Sangachal terminal is a vital link in Azerbaijan's oil and gas industry. It is an oil and gas terminal that receives, processes, stores, and exports crude oil and gas produced from all currently operated BP assets in the Caspian basin and has room for expansion. The terminal includes oil and gas processing facilities, the first pump station for the Baku Tbilisi Ceyhan (BTC) oil pipeline, the South Caucasus gas pipeline (SCP) compressor, and other facilities. STEP is the part of the terminal that has been expanded to receive, store, and process oil from the Azeri and Deepwater Gunashli sections of the Azeri-Chirag-Guneshli fields and gas from the Shah Deniz fields. It houses a number of facilities, including 3 crude oil storage tanks with 880,000 barrel capacity each, ACG oil processing facilities, and trains., 2002, 2009

Professional Development

  • PMP: Project Management Professional
  • Development of young C&I Engineers

Timeline

CONTROL AND INSTRUMENTATION PRINCIPAL ENGINEER - SOCAR-KBR
01.2019 - Current
SENIOR CONTROLS INSTRUMENT ENGINEER - Rapid Solutions Ltd
06.2018 - 06.2019
INSTRUMENT / CONTROL SYSTEM COMMISSIONING ENGINEERING - BP
01.2013 - 10.2017
CONTROLS / INSTRUMENTATION COMMISSIONING ENGINEER - BP / Swift Technical
06.2011 - 07.2013
CONTROLS / INSTRUMENTATION ENGINEER - BP
02.2002 - 10.2009
INSTRUMET SPECIALIST - SOCAR
08.1998 - 03.2002