Summary
Overview
Work History
Education
Skills
Languages
Representative projects
Currentprojects
Timeline
Generic

Abdolhamid Sohrabi

Baku,BA

Summary

I have got more than 16 years’ experience in the Oil, Gas & Petrochemical and building electrical industries. I’m a motivational and experienced engineer with good communication and organizational and interpersonal skills. I have experience in Simulation for power systems in oil and Gas Project & Industrial Plants/ Well Qualified to Analyses the Technical Documents, “FEED, Basic, Detail & Design review”/Cooperation in Pre-qualification & Performing Test & Inspection "FAT: Factory Acceptance Test" and Comprehensive Experience in requirements of standards/ specification and Good knowledge of Power Systems and Standard Codes in general, IEC, GOST, BS, NEC, API, NACE & etc.

Overview

18
18
years of professional experience

Work History

Electrical Team Lead

SFW
05.2016 - Current
  • Bukhara MTO project work package 1 (WP1)
  • HAOR Modernization project Package B
  • HAOR Modernization project Package A
  • HAOR Revamp early activities /SFW
  • HAOR Modernization FEED Project (electrical design for Process Units and 3 item 6/0.4 kV substations) /SFW
  • BBU Integration (6kV feeders from grid substation design) /SFW
  • LPG Loading EPC (0.4kV substation design) /SFW

Lead Electrical Engineer

Caspian Engineering Company
12.2008 - 05.2016
  • Azerbaijan Methanol plant (Basic and detail engineering)
  • SOCAR CNG compressor station(Detail design Engineering)
  • Azpetrol compressor station



Electrical Engineer

ENI SAZEH JV CO
05.2008 - 12.2008
  • Electrical Field Engineer for Darquin oil production facility


Electrical Engineer

Jahanpars Construction CO
12.2006 - 05.2008
  • Electrical team technical office engineer


Education

Skills

  • Medium and Low voltages in project phases : FEED and detail Engineering(EPC)
  • Experience of oil &gas Refinery,Petrochemical plants
  • Power System Studies, Load Flow & Short Circuit Calculation for Power Plants and Industrial Plants using ETAP Software
  • Load list, transformer, generator and cable sizing
  • MCC and MV and LV switchgear design
  • CT&PT Sizing Relay and protection system design includes of protection relay selection and relay setting calculation
  • Motor VSD, soft starter, harmonic filter and capacitors calculation and design
  • Schematic diagram of electrical panels Cable schedule and termination diagram and cable route preparation Hazardous area classification Explosion proof Equipment selection
  • Grounding System Design According to IEEE Std 80-2000
  • Lightning Protection System Design and surge arrester calculation

Languages

Azeri
English

Representative projects

  • HAOR Modernization project Package B
  • HAOR Modernization project Package A
  • HAOR Revamp early activities /SFW
  • HAOR Modernization FEED Project (electrical design for Process Units and 3 item 6/0.4 kV substations) /SFW
  • BBU Integration (6kV feeders from grid substation design) /SFW
  • LPG Loading EPC (0.4kV substation design) /SFW
  • SOCAR CNG Compressor Gas station Project EPC (10/0.4 kV substation)/ Caspian Engineering company
  • Methanol plant, Basic, detail design and operations, Azerbaijan Methanol Plant / Caspian Engineering Company.
  • Darquin oil production project, Electrical Feild Engineering/ ENI – Sazeh Company

Currentprojects

  • SOCAR-Foster Wheeler Engineering. HAOR Modernization Project

Timeline

Electrical Team Lead

SFW
05.2016 - Current

Lead Electrical Engineer

Caspian Engineering Company
12.2008 - 05.2016

Electrical Engineer

ENI SAZEH JV CO
05.2008 - 12.2008

Electrical Engineer

Jahanpars Construction CO
12.2006 - 05.2008

Abdolhamid Sohrabi