Microsoft Office
Enthusiastic procurement engineer eager to contribute to team success through hard work, attention to detail and excellent organizational skills. Clear understanding of purchasing electronics and instrumentation and training in inside sales. Motivated to learn, grow, and excel in electronics and electromechanical projects.
Team Player
DEWA-JEBEL ALI
Dubai - August 2019 - January 2022
· Design and installation of a new flowmeters in two desalination units to provide high accuracy reading with OEM approval.
· Removal of existing magnetic flow sensors from two desalination units (insertion type) & other instruments like gauges installed near.
· Installation of new Junction boxes near to the flowmeters for connecting the flow signal cabled Epoxy coated new cable trays for laying signal cable from new flow meters to junction boxes.
· Installation of new access platforms to access the flow meter for maintenance work of room.
· Grinding & fabrication, Wiring, ferruling, marking & cable termination till new junction box as well as Commissioning and Testing of parameters in new flow meters.
· Supply & installation of Softstarter panel with motor protection relay, installation, of cable tray, laying of power cable, and integrating with existing PLC system.
· Identification of installation location, marking up of the installation location.
· Identification of tapping location from the existing panel.
· Tested the panel with the temporary supply for its operation, PLC, programming, parameterizing, and relay testing.
· Sand Blasting for Steam Turbine. (Spares)
· Surface Preparation and Protective Coating of Desalination Unit D station.
· Assigned services are for SS Piping Renewal of High Pressure Duplex Pipes & Associated Fittings.
· Prefabrication at DEWA workshop onsite, which done installation of renewed piping and fittings at site and commissioning of all 3 Units into operation.
· Replacing existing corroded / defective pipes on , brine header , feed header & vent header for all 3 units.
· Fabrication of stub end spools with flanges and both short and long U bends.
· Removal, machining and reinstallation of blind flanges and replacement of Pipes 2 meters length for all 3 units.
· Completed NDT, radiography and hydrostatic pressure testing and pickling & passivization treatment sessions.
Microsoft Office
Microsoft Excel
MATLAB
Labview
C, C
Date of birth
26/09/1995
Visa status
Active (Golden Visa)
Marital status
Married