Summary
Overview
Work history
Education
Timeline
Generic
Ali Ekber Boy

Ali Ekber Boy

Summary

Ali Ekber Boy is an Architect with 26 years of experience. For the past 19 years, he has gained his experience in this field by working in large-scale projects in the curtain wall department of architecture. He graduated from Istanbul Technical University, department of Architecture in 1995. In projects in Turkey and overseas, he has undertaken tasks such as project studies, proposal studies, arrangement of all contracts of external suppliers and subcontractors, especially in large-scale projects as project manager, technical office manager, and project and construction sites coordinator. He made business trips to countries such as Kazakhstan, Azerbaijan, Iran, Georgia, Algeria, England, Montenegro and Libya when deemed necessary in the projects he was involved. Ali Ekber is proficient in AutoCAD, MS Office and Photoshop software. His professional communication skills include fluency in English and Turkish.

Overview

32
32
years of professional experience
1995
1995
years of post-secondary education

Work history

Project Manager

IDEA YAPI MMC
Baku, Baku City
08.2025 - Current
  • Utilised advanced project management tools for superior tracking and reporting.
  • Expedited issue resolution to minimise delays in project timelines.
  • Guided the development of project objectives, established clear performance expectations.
  • Implemented quality control measures, ensured adherence to standards.

Facade Coordinator Architect

Turner International
04.2021 - 01.2023
  • Istanbul Finance Center Project
  • Turner is providing project management services for Istanbul Financial Center (IFC), the place where the heart of not only the Turkish but also the international markets will beat, right next to the Capital Markets Board building.
  • Once completed, the project will be a home to headquarters and offices of affluent private and public firms. The IFC project will be creating a center designed to serve world financial sector and 24/7 as a public hub. Its A-class offices and commercial spaces, as well as its architecture, location and high standards make The Istanbul Finance Center a candidate to be a prestigious international business center of the world.
  • Major infrastructure improvements include a transportation system featuring a new subway line and a station, as well as new infrastructure for sustainable power, water, data and security.
  • Responsibilities:
  • Project Management of the facade works of Sabri Paşayiğit Architecture in the IFM project. (for Stock Exchange building SPK building and Special Project Area A&D block.)
  • Checking the facade designs regarding design criteria which is specified in technical specifications, Following site installation works and planning.
  • Incorporating Turner comments such as Shop Drawing, RFI into all facade design comments, first to the employer and then to the DCC.
  • Examining all facade material presentations submitted by the employer according to the specification and conveying their comments to the employer. Determining the points that will cause problems in the future in the IFM facade works specification and making employer presentations
  • Organizing Meetings with REITs and Contractors, preparing the agenda beforehand, arranging the meeting notes afterwards and forwarding them to DCC, Managing the front part in routine meetings with the employer.

Technical Manager

Alucon Yapı Sanayi Ticaret Anonim Şirketi
06.2018 - 02.2020
  • Portonovi Resort and ONE&ONLY Hotel, Montenegro
  • Within the scope of the "Portonovi Luxury Resort" Project, which includes a marina, Europe's first "One
    & Only" hotel project and luxury residences in Herceg Novi, Montenegro, there is also the Espace Chenot Health Club, next to the Tapasake Restaurant. There are 224 residences from 1+1 to 3+1 and villas with private pools in the project, which will also include a restaurant by the world-famous chef Locatelli, whose row design is also designed by GMW Architecture. The facility, which was built on a 260-decare former naval base with a 2-kilometer coastline, is located in Boka Bay, overlooking the Kotor Region, which is on the UNESCO World Cultural Heritage List. In the project;
  • 35.000 m2 GFRC coating
  • 6.000 m2 Aluminum doors and windows
  • 7.000 m2 Roofing
  • 6.000 m2 Sheathing
  • 25.000 m2 Gypsum plaster and paint work
  • 2.000 m2 Wooden doors and windows
  • 2.000 m2 Glass partitions
  • 12.000 m2 Concrete flooring
  • 6.000 m2 Ceramic coating
  • 3.000 m2 wallpaper covering
  • Hotel complex infrastructure works
  • 10,000 tons of sand transport (for beaches)
  • 350 tons of steel works
  • Wooden canopy and pergola applications
  • Glass Balustrade
  • There are concrete retaining walls and roads.
  • Responsibilities:
  • Management of Preparation of shop drawings
  • Participation in site project coordination meetings
  • Coordination and presentations with our outsourced companies
  • Follow-up and revision of project revisions
  • Planning and ordering all façade and shell material orders
  • Quantity removal
  • Making detailed studies for the proposal
  • Price research and cost analysis for the proposal
  • Giving the latest updated projects for the construction site teams.

Site Manager

Alusan Yapı Sistemleri
03.2017 - 01.2018
  • Çeşme- İzmir Reges, a Luxury Collection Resort & SPA
  • 5.500 m2 sliding joinery and standart joinery facade systems.Curtain Wall systems
  • Kadıköy – İstanbul Başarı Holding Office Building
  • 5.200 m2 stick system facade and 4.300 m2 unitised panel system facade systems.

Project Coordinator

Arte Yapı Facade Systems
10.2013 - 08.2016
  • Tripoli Libya Burj Al Baher Office, Residence and Hotel Project
  • 36.000 m2 panel facade systems were applied.
  • NEF'09
  • 20.000 m2 stick system, joinery, plate, sunshade, ceramic works.
  • Mermerler Plaza
  • 24.000 m2 panel facade, stick system facade and mesh manufacturing.
  • Responsibilities:
  • Execution of technical procurement works for construction sites
  • Material presentations for approval
  • Planning façade materials production and dispatch coordination between the construction site and center
  • Ensuring general production and dispatch coordination between the construction site and the center
  • Follow-up of site installation. Attending center & construction site meetins.

Project Manager

Dekoral Aluminum Industry. Trade Inc.
05.2012 - 09.2013
  • Zeytinburnu- İstanbul Ottomare Suits & Residences
  • 12.500 m2 curtain wall and sliding joinery work has been completed. Schüco FW 50 facade and ASS 50 sliding systems were applied in the project.
  • Petek Wyndham Hotel
  • 7.700 m2 stick facade, planar facade and composite panel work have been completed. Schüco FW 50 facade and ASS 50 sliding systems were applied in the project.
  • Beylikdüzü – İstanbul Marmara Park Shopping Mall
  • 30.000 m2 of facade, skylight, composite panel and joinery works were done.

Project Coordinator

Feniş Sistem Yapı A.S
04.2005 - 05.2012
  • Marriott Absheron Hotel, Bakü
  • 26.000 m2 specially designed facade (panel + semi-panel), 2.600 m2 glass balustrade, 5.000 m2 aluminum sophite sheet and sunshades were applied in the project.
  • Radisson Hotel, Batumi
  • 12.000 m2 special covered facade, 500 m2 planar canopy project has been implemented.
  • Capital Business Center, Istanbul
  • 5.000 m2 unitised panel facade and stick facade joinery.
  • Akbank Banking Center, Kocaeli
  • 500 m2 curtain wall and 7.200 m2 alpolic composite cladding.
  • Levent – İstanbul Kanyon Complex Project
  • 50.000 m2 facade, residential block, shopping mall block, office block, entertainment block, shop drawings.
  • Responsibilities:
  • Between April 2005 and April 2007:
  • Drawing of application projects
  • Material orders
  • Preparation of domestic and international offers
  • Preparation of the Work Program
  • Preparation of subcontractor contracts
  • Site delivery and closure works.
  • Ensuring general production and dispatch coordination between the construction sites and the center.
  • Between May 2007 – March 2012: Project and Construction Sites Coordinator;
  • Execution of technical procurement works for construction sites, preparation of subcontractor contracts, all cost control studies, Planning, Work delivery studies, Site setup, general production and dispatch coordination between construction sites and headquarters, participation in employer meetings, follow-up of construction site delivery works, closure of the construction site.

Architect

Sinerji Construction Architecture
09.2003 - 04.2005
  • Oman Royal Flight Hangar
  • 3.000 m2 Arabian profile was applied in the project.
  • Maldives Airport
  • İzmit- Kocaeli Dolphin Business Center
  • 10.000 m2 composite board, 5.000 m2 joinery, 1.550 m2 Skylight applications were made.
  • Responsibilities:
  • Preparing and submitting of Shop Drawings and site application projects
  • Ordering Façade materials.
  • Preparing of manufacturing drawings.

Project Chief

Ekol Yapı Facade Systems
08.2002 - 09.2003
  • Responsibilities:
  • Making facade designs and 3D presentations together
  • All orders regarding the delivery phase of the work
  • Implementation and construction site coordination.

Architect

Alines Aluminum
05.2001 - 08.2002
  • Responsibilities:
  • Making facade designs and 3D presentations together
  • Preparation of proposal and implementation projects.

Architect

Seçkin-Necdet Engineering Consultancy
12.1998 - 06.2001
  • İşbank Headquarters, Istanbul
  • 70.000 m2 exterior, granite marble, interior granite marble.
  • Responsibilities:
  • Preparing shop drawing and as-built drawings.

Architect

Güdü Architecture Engineering
02.1994 - 05.1996
  • Silivri 4 Villas Construction
  • Responsibilities:
  • Preparing architectural project drawings and responsibility for rough construction applications.

Education

Bachelor's Degree - Architecture

Istanbul Technical University

Timeline

Project Manager

IDEA YAPI MMC
08.2025 - Current

Facade Coordinator Architect

Turner International
04.2021 - 01.2023

Technical Manager

Alucon Yapı Sanayi Ticaret Anonim Şirketi
06.2018 - 02.2020

Site Manager

Alusan Yapı Sistemleri
03.2017 - 01.2018

Project Coordinator

Arte Yapı Facade Systems
10.2013 - 08.2016

Project Manager

Dekoral Aluminum Industry. Trade Inc.
05.2012 - 09.2013

Project Coordinator

Feniş Sistem Yapı A.S
04.2005 - 05.2012

Architect

Sinerji Construction Architecture
09.2003 - 04.2005

Project Chief

Ekol Yapı Facade Systems
08.2002 - 09.2003

Architect

Alines Aluminum
05.2001 - 08.2002

Architect

Seçkin-Necdet Engineering Consultancy
12.1998 - 06.2001

Architect

Güdü Architecture Engineering
02.1994 - 05.1996

Bachelor's Degree - Architecture

Istanbul Technical University
Ali Ekber Boy