Constructed steel, and insulators for switches. Assisted running cables from switches up to A frame steel. Pressed connections with DMC press. Inside control hose helped move wire rack for relay panels. Pulled cables for breakers.
Worked in the control house which included installing lights, receptacles, battery racks, batteries, and installing racks for relay panels. Assisted in running cables in the trenway from the control house to breakers, outside lights, switchgears, and capacitor banks.
Outside the control house I helped run grounding wire and grounded steel structures.
Building Electrical Sub Stations
Set steal
Pulled Wire
Landed Electrical Wire
Followed Safety Proticals