Summary
Overview
Work History
Education
Skills
Timeline
Generic

Dennis Abbott

Lake Havasu City

Summary

Professional machinist with solid background in CNC operations and keen eye for precision. Skilled in programming, setup, and operation of CNC machines, with focus on efficiency and quality. Strong collaborator, adaptable to changing demands, and dedicated to achieving optimal results. Known for reliability and strong work ethic in team environments.

Overview

16
16
years of professional experience

Work History

CNC Machinist

Astro Haven
02.2017 - Current
  • Maintained tight tolerances with design specifications.
  • Improved accuracy in part production by utilizing precise measurement tools and calibrating machines accordingly.
  • Reduced machine downtime through regular maintenance and troubleshooting of equipment issues.
  • Manually set up machinery, lathes, and grinders.
  • Maintained detailed documentation of completed tasks, ensuring accurate record-keeping for future reference or process improvements.
  • Adapted quickly to changes in project specifications, adjusting programs or setups as needed for successful execution.
  • Increased production efficiency by closely studying blueprints for accurate machine programming.
  • Exceeded production goals consistently by focusing on effective time management strategies while maintaining a strong attention to detail.
  • Collaborated with engineering team to develop custom machining solutions for complex projects.

CNC Machinist

Graphite Sales
12.2012 - 02.2017
  • Partnered closely with quality control teams to identify areas where improvements could be made within production processes.
  • Properly loaded and unloaded materials in and out of machines.
  • Ensured consistent high-quality output by conducting thorough inspections using various gauging techniques.
  • Contributed to a safer work environment by adhering to safety protocols and promoting awareness among team members.
  • Enhanced productivity by implementing efficient CNC programming and machine operation techniques.
  • Regularly exceeded daily production goals by effectively troubleshooting machinery and programming issues.
  • Streamlined workflow processes for faster job completion and increased customer satisfaction.
  • Studied daily work instruction, sketches, drawings, blueprints, and manuals to determine dimensions and tolerances accurately.
  • Inspected, repaired and replaced system components.
  • Collaborated closely with engineering team to refine product designs for manufacturability.
  • Measured, examined or tested completed units to check for defects and verify conformance to specifications using precision instruments such as micrometers.
  • Manually set up machinery, lathes, and grinders.
  • Exceeded production goals consistently by focusing on effective time management strategies while maintaining a strong attention to detail.

General Construction Laborer

Greene Construction
12.2010 - 12.2012
  • Assisted in the accurate measurement and marking of construction materials for precise cutting and installation.
  • Demonstrated adaptability by quickly learning new skills and techniques required for specific project needs.
  • Performed general construction work on both residential and commercial building projects.
  • Operated heavy machinery, such as forklifts and backhoes, to transport materials and assist in excavation efforts.
  • Executed daily duties to meet strict deadlines and drive forward progress.
  • Supported skilled trade workers, such as carpenters and electricians, in completing complex tasks efficiently and accurately.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Collaborated with construction teams to install new electrical systems in residential and commercial properties.
  • Conducted thorough evaluations of existing electrical systems, providing recommendations for improvements or repairs as needed.
  • Used testing instruments such as ohmmeters, voltmeters, ammeters, and multimeters.
  • Demonstrated expertise in use of cable reels, stripping tools, voltage detectors, and wire and cable cutters to complete fast-paced work.
  • Repaired or replaced wiring, equipment and fixtures using hand tools and power tools.

General Laborer

KNB Construction
06.2009 - 12.2010
  • Increased overall project quality by performing thorough inspections of completed work to identify any necessary adjustments or repairs.
  • Assisted crew members with complex tasks requiring close teamwork and coordination to meet quality specifications.
  • Expedited task completion times using power tools and hand tools proficiently while adhering to safety guidelines.
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Worked on sites, installing roofs and other exterior components.
  • Helped with door and window installations.
  • Assisted in digging, trenching and backfilling trenches and foundations.
  • Demonstrated adaptability by quickly learning new skills and techniques required for specific project needs.
  • Performed general construction work on both residential and commercial building projects.
  • Supported skilled trade workers, such as carpenters and electricians, in completing complex tasks efficiently and accurately.

Education

Union High School
Tulsa, OK

Skills

  • Blueprints reading
  • Multi-axis machining
  • Precision measurement
  • Equipment set up
  • Machine setup
  • G-code programming

Timeline

CNC Machinist

Astro Haven
02.2017 - Current

CNC Machinist

Graphite Sales
12.2012 - 02.2017

General Construction Laborer

Greene Construction
12.2010 - 12.2012

General Laborer

KNB Construction
06.2009 - 12.2010

Union High School
Dennis Abbott