Thorough [QA/QC Manager ] with robust background in quality assurance and quality control management. Managed multiple projects ensuring adherence to industry standards and regulatory compliance. Demonstrated effective problem-solving and team leadership skills in high-pressure environments.
Overview
12
12
years of professional experience
1
1
Certification
Work History
Project QA/QC Manager
POWER CHINA HDEC AZERBIJAN BRANCH
Baku, Azerbaijan (Remote)
07.2023 - Current
240 MW Khizi-Absheron Wind Power Project
Monitoring and update Method Statement and, ITP and Risk assessment.
Monitor and update the project quality management plan, Quality policy and quality procedures.
Monitor and update the Quality master document list with IEC codification and RDS coding for the factory acceptance tests and other project QA/QC documents.
Coordinate with the EPC third-party for the inspection of manufacturing at China.
Coordinate with the client for technical discussion related with the geotechnical investigations for wind turbine generator and road areas for practical solutions.
Coordinate with the client for lab and plant trails for the mix design of the project.
Follow up the material approvals and testing of the project.
Follow p the inspection request for temporary and permanent works.
QA/QC ENGINEER
CONSTRUCTION CORPORATION OF CHINA
08.2022 - 06.2023
UAE WIND POWER PROGRAMME :104 MW.
Involved to deal with the site issues regarding to the Excavation, Dewatering and materials.
Coordinate and communicate with the site working Subcontractors for the quality of work.
Arranging the inspections for the WTG foundation rebar, formwork, Bitumen coat and Grout.
Taking care of QA/QC documents of the SILA Site including certificates, calibration, test results, inspection requests, Material approval requests, Non-compliance reports and other QA/qc documents.
Communicate with the Electrical and mechanical team to solve their problems related with civil works.
QA/QC ENGINEER
ENGINEERING CO.LTD.
10.2020 - 08.2022
Wind Power Energy Project Jhampir Sindh Pakistan.
Monitoring and update Method Statement, QIP and PQP.
Satisfactory close-out Nonconformities with practical solutions and ensure root cause is well captured and prevented.
Work on document such as Submitting and closing the Request for inspection and testing (RITs).
Submitting the MAR (Material Inspection request at the time and doing inspection after arrival of material at site.
Responsible for the quality and workmanship of every activity, thorough knowledge of all phases of engineering construction relating to Civil, and Structural discipline interfacing the multidisciplinary operations.
Taking care of QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non- compliance reports and site instruction/observations, and other QA/QC documents.
Layout and coordinates before and after excavation inspections of wind turbine generators, OHL towers, wet mast towers and substation buildings.
Carrying out Reinforcement and formwork prior to proceed concrete work inspections of Wind Turbine Generators and overall substation buildings (Auxiliary Building, Accommodation Building, Control Building, Metering room and Guard room, AIS area (SVC, fire wall and transformer’s), OHL towers, wet mast towers).Geotechnical site investigation, soil penetration test, Plate load test FDT, ERT test, cavity probing Test and Grouting.
QA/QC Engineer
DOGUS INSAAT
Doha
05.2016 - 11.2019
Company Overview: CON: EGIS INTERNATIONAL.
Construction and upgrade of Rayyan road project P007 C2 Doha Qatar.
CLIENT: ASHGHAL.
Monitoring and update Method Statement and, ITP and Risk assessment.
Involved to perform and prepare the Audit reports with SC.
Satisfactory close-out Nonconformities with practical solutions and ensure root cause is well captured and prevented.
Follow ups with 3rd parties for constructions material testing as project requirements.
Monitoring Crusher (Wet Mix Plant) operation by ensuring proper Material Quality traceability is achieved.
Follow ups the Asphalt laying operations at site (Rolling pattern Paving Plan, Core cutting International Roughness index test Straightedge test, road marking.
Carrying out internal inspections of reinforcement and formwork prior to proceed with concreting.
Quality control of concrete from batching to pouring point. Compliance with site health and safety regulations.
Review quality of all materials at the site and ensure compliance with all project and specification.Follow up the inspections of earthwork FDT, soil sampling and testing.
Geotechnical site investigation, soil penetration test, Plate load test FDT, ERT test, cavity probing Test and Grouting.
TRAINEE GEOLOGIST
Pakistan Petroleum Limited
Karachi, PAKISTAN
01.2014 - 01.2015
Monitor and interpret all well site operations such as, Drilling logging, coring, casing, directional drilling fishing and completion.
All equipment and sensors are maintained service and calibrated according to the company standard procedures.
Catch the samples regularly after particular interval (decided by our supervisor) their analysis, marking, packing storage and dispatched. Analysis of formation cuttings and mud samples for the detection of Oil and Gas.
Assist and co-work with handling well site geologist to mark core point, monitor coring operations analysis of cutting during coring, core handling, marking, description, hydrocarbon show analysis packing and dispatch of the core.
Follow health safety and environment rules, working safely and environment friendly.
TRAINEE GEOLOGIST
FRONTIER WORK ORHINIZATION (PAKISTAN)
03.2014 - 09.2014
Engineering analysis, engineering design, construction recommendations, and report preparation in the light of FDT, ATTERBERG LIMIT TEST, EXTRACTION OF BITUMEN TEST, GMM TEST. Monitoring the asphalt work at the site, core cutting, surface evenness test, and collecting the samples from the site for testing in lab.
Education
Bachelor of Science - Engineering Geology
University of Sindh Jamshoro
12.2013
Skills
Training and mentoring
Kick of meeting
Quality management systems
Inspection and testing plans
Coordination for FATs And EOMRs and review
Method statements
Technical solutions for Wind turbine Equipments
Coordination with procurement
Commissioning Quality
Electrical Quality and mechanical Quality management
Documentation management
Corrective action planning
Internal audits
Certification
ISO 9001:2015 Quality Management System (IRCA certified) Lead Auditor Training course.
Advance road construction practices training (WRITGEN)
QA/QC Project Manager/Lead Material and Corrosion engineer and QA/QC Project Coordinator at NNPC E & P / ND Western JVQA/QC Project Manager/Lead Material and Corrosion engineer and QA/QC Project Coordinator at NNPC E & P / ND Western JV