Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Francisco Meza

Red Rock

Summary

Professional Summary

Results‑driven Project Manager with 10+ years of experience overseeing low‑voltage installations, construction coordination, and third‑party contractor management across commercial, industrial, and government environments. Proven ability to deliver complex projects on time and within budget while maintaining strict safety, quality, and compliance standards. Adept at cross‑functional communication, scheduling, budgeting, and technical oversight of systems including access control, CCTV, structured cabling, fire alarm, audio/visual, and network infrastructure.

Overview

12
12
years of professional experience

Work History

Fiber Optic Foreman, BSW, Design

Cox Communications
Casa Grande
01.2017 - Current
  • Supervised installation and maintenance of fiber optic networks, ensuring high-quality standards and timely project delivery.
  • Resolved technical issues encountered during installations promptly.
  • Trained new technicians on installation techniques and safety procedures.
  • Conducted site inspections to evaluate project requirements and allocate resources effectively.
  • Worked closely with contractors, subcontractors, engineers, inspectors and other professionals throughout the duration of each project.
  • Ensured compliance with safety regulations during project execution.
  • Resolved customer complaints regarding faulty or malfunctioning systems quickly and efficiently.
  • Maintained detailed records of completed work, tracking materials used and labor hours to support project accountability.
  • Organized inventory levels of supplies needed for ongoing jobs as well as future projects.
  • Coordinated team schedules and workflow for efficient operations.
  • Coordinated with vendors regarding supply orders and delivery schedules.
  • Maintained records of all work completed including materials used, labor hours spent.
  • Monitored progress of projects to ensure completion within specified timeframes.
  • Participated in meetings with management personnel regarding current projects as well as upcoming ones.
  • Installed outside plant fiber optics in manhole and telco boxes.
  • Inspected fiber optic cables to ensure proper installation and connection.

On Site Project Manager

Synergy Broadband
Ann Arbor
01.2014 - 12.2016
  • Managed $500K–$5M low‑voltage and construction projects from planning through closeout.
  • Oversaw 10–40 third‑party contractors including cabling crews, electricians, integrators, and specialty vendors.
  • Coordinated with general contractors, architects, engineers, and AHJs to ensure compliance with NEC, NFPA, and local codes.
  • Developed and maintained project schedules, tracked milestones, and mitigated delays through proactive planning.
  • Conducted site walks, QA inspections, and punch‑list reviews to ensure workmanship met specifications.
  • Led weekly OAC and subcontractor meetings, providing updates on progress, risks, and financials.
  • Managed change orders, procurement, and vendor negotiations to maintain budget alignment.
  • Delivered projects including access control systems, CCTV deployments, fiber/copper cabling, A/V installations, and network buildouts.
  • Supervised field technicians and subcontractors performing structured cabling, device installation, and testing.
  • Assisted PMs with submittals, RFIs, as‑builts, and material takeoffs.
  • Ensured all work adhered to TIA/EIA standards and project specifications.
  • Performed system commissioning, troubleshooting, and client training.
  • Improved installation efficiency by 20% through workflow optimization and crew coordination.

Education

Associate of Science - Business Administration

Chaparral College
Tucson, AZ
12-1999

Skills

Core Competencies

  • Low‑Voltage Systems — Access control, CCTV, cabling, A/V, fire alarm
  • Construction Management — Scheduling, phasing, site coordination
  • Contractor Oversight — Vendor selection, performance tracking
  • Project Scheduling — Critical path, resource allocation
  • Budget & Cost Control — Estimates, forecasting, change orders
  • Quality Assurance — Inspections, punch lists, documentation
  • Technical Documentation — As‑builts, submittals, RFI management
  • Stakeholder Communication — Owners, GCs, inspectors, vendors
  • $32M Security Upgrade – Distribution Center Managed access control, CCTV, and fiber backbone installation across 1M sq ft facility
  • $11M Structured Cabling – Corporate Office Buildout Oversaw 2,500 cable drops, IDF buildouts, and A/V integration
  • $800K A/V & Network Deployment – Education Campus Coordinated multiple contractors across 6 buildings under tight deadlines

Languages

English
Professional
Spanish
Professional

Timeline

Fiber Optic Foreman, BSW, Design

Cox Communications
01.2017 - Current

On Site Project Manager

Synergy Broadband
01.2014 - 12.2016

Associate of Science - Business Administration

Chaparral College
Francisco Meza