Dynamic Electrical Superintendent overseeing large-scale electrical installations with a focus on projects valued at $100M+. Proven expertise in managing high-voltage systems for hyperscale data centers while ensuring safety, compliance, and quality control across all project phases.
Overview
15
15
years of professional experience
Work History
Superintendent
CEC
Irving
04.2026 - Current
Oversaw electrical installations and field operations for hyperscale data center campuses valued at $50M - $100M+, ensuring project milestones were met efficiently.
Directed daily field installations of medium-voltage switchgear, paralleling generator plants, and rotary/static UPS systems.
Facilitated collaboration among client, vendor, and commissioning teams during rigorous testing and energization readiness phases, ensuring seamless project turnover.
Performed regular inspections and quality control checks to verify compliance with electrical codes and specifications, enhancing project integrity and safety.
General Foreman
Dynalectric
Chandler
05.2023 - 12.2025
Directed the 35kV electrical installation for a 425,530 sq. ft. building (OC43), managing switchgear, one-line equipment, and complex medium-voltage wire pulls on schedule.
Managed installation of all One Line electrical equipment, ensuring safety and compliance with standards.
Directed site teams in setup and testing of One Line electrical systems, facilitating smooth project execution.
Develop and execute a plan to pull medium voltage wire, plan the route carefully, set up pulling and safety equipment, and pull the cable smoothly while watching tension limits.
Developed project plans detailing tasks, timelines, and resources, enhancing clarity and coordination among teams.
Monitored project timelines, ensuring all tasks were completed within established deadlines to maintain project flow.
Communicated with clients to address project needs and expectations.
Develop best practices for Electrical techniques and standards
Foreman/General Foreman
OEG Electric
Chandler
11.2020 - 05.2023
Supervise and coordinate the installation of all 35KV Distribution System at Intel Fab 52.1 & 52.2 (2.9 million sq ft facility)
Established and adjusted work sequences to align construction schedule with equipment capacities and personnel assignments.
Monitored crew activities, ensuring compliance with safety regulations and enhancing overall site safety.
Conducted operations around high voltage energized equipment, ensuring strict adherence to safety protocols.
Inspect quality of finished work to ensure conformance to specifications
Installation of Gas Insulated Switch Gear
Operated within an industrial and chemical environment, adhering to safety standards.
Executed additional responsibilities to support team objectives.
Coordinate with other trades as well as general contractor
Estimator
Sturgeon Electric Company, Inc.
Tucson
03.2018 - 09.2020
Estimator for commercial and industrial electrical projects
Prepared project estimates in accordance with scope of work, developed quantity take-offs, and determined manpower, equipment, material, and subcontractor requirements to ensure accurate project budgeting
Communicated with operations team during bid cycle to validate execution strategy and develop indirect cost models, enhancing project cost accuracy
Collaborated with operations team on constructability reviews, developing preliminary rigging plans and selecting cranes to optimize project execution
Work with the proposal team to identify, analyze and mitigate the potential project risks and contingencies
Assist in obtaining quotes from material suppliers, equipment vendors and subcontractors
Obtain, review and input information from contracts, legal, finance and other support groups
Inside Wireman Foreman
Sturgeon Electric Company, Inc.
Tucson
05.2015 - 03.2018
Install, test and modify circuit breakers, controls, fuses, lights and motors
Replace all power distribution equipment from switchgears to distribution panels
Work with various types of cableways, conduits and other electrical raceways
Interpret drawings, wiring diagrams, flow charts and written descriptions of the project requirements
Conducted thermography studies on electrical equipment to identify potential issues and enhance reliability
Prepared thermography reports detailing findings to support maintenance and operational decisions
Responded promptly to electrical emergencies, minimizing downtime and ensuring safety
Fabricate specific electrical component parts and assemblies
Apprentice
Sturgeon Electric Company Inc.
Tucson
03.2011 - 05.2015
Achieved 3M certification as a Medium Voltage Technician, demonstrating expertise in high voltage systems.
Executed installation of medium voltage equipment switchgear, contributing to enhanced electrical system reliability.
Install medium voltage 13.8 KV loadbreaks, deadbreaks and splices
Install medium voltage transformers
Led installation of field instruments and initiated equipment upgrades for prisons and hospitals to enhance operational capabilities.
Installed generators, UPS systems and executed associated wiring
Preventative maintenance on 13.8 KV distribution panels
Install new equipment including conduit, wire, cable, pull boxes and transformers for repairs and alterations in high voltage systems
Specialized in various aspects of commercial electrical work, focusing on installations and maintenance..
Interpreted drawings, wiring diagrams, flow charts and written descriptions of the project requirements
Delivered reliable distribution power to University of Arizona Stadium scoreboard, ensuring consistent performance during events.
Education
Electrical Apprenticeship Program IBEW 570
Tucson
05-2016
High School Diploma -
Tucson High School
Tucson
05-2003
Skills
Mission-Critical Systems: Data centers, hospital systems, and cleanrooms
High-Voltage Systems: Substations, switchgear, and complex distribution
Emergency Power: UPS systems, backup generators, and ATS
Project Management
System Testing: Commissioning (Cx), NETA testing, and quality control
Field Supervision: Crew scheduling, labor allocation, and productivity tracking
Schedule Acceleration: Critical path method (CPM) and Look-Ahead schedules
Notable Project History
Salpointe Catholic High School Center for the Arts-Demo and Fiber Install, Salpointe Catholic High School, 11/13/18, 08/30/20, $1,941,590.00, Demo existing building to prepare for remodel. Install new fiber. New distribution gear to feed Gyms as well as feed new Center for the Arts building. Installed wire to CFTA. Remodel theater.
University of Arizona - Arizona Stadium East Sideline Renovation, University of Arizona through the Arizona Board of Regents, 02/01/18, 09/01/18, $3,555,673.00, Sturgeon installed new electrical distribution equipment to feed the existing stadium and new under-bowl area. This included systems from low-voltage, Sound, PA, CCTV, Fire Alarm, Security, Mass Notification, Architectural Lighting, and Tele-data.
University of Arizona Scoreboard Infrastructure, University of Arizona through the Arizona Board of Regents, 03/23/11, 08/01/11, $351,655.00, Provision of new medium voltage transformer and switch for new scoreboard electrical feed.
Years Of Experience
15
Personal Information
Title: Inside Journeyman Wireman
Certifications Training
Local Joint Apprenticeship Training Program, 01/01/11-12/31/16
JATC – 8000 Hours OJT and 1200 Hours of Electrical Theory/Training
NECA Foreman Training – How to Lead
IBEW Foreman Development Training
Sturgeon Electric General Foreman Development
NECA Estimator Course
IBEW Code of Excellence
MSHA
OSHA 10 - Construction
CPR/First Aid
3M 35KV Medium Voltage Splicing and Safety Certified
Pfisterer Size 3 Medium Voltage Termination Certified
Raychem 12KV Medium Voltage Termination Certified
Level 1 Thermographer Certified
Excel Proficient
Accubid Proficient
Experience Highlights
Project Lonestar - 600MW Data Center Campus.
The Citadel - RN0 4 - Reno,NV 100MW Data Center. Control systems.
Intel Ocotillo Campus – OC43 General Foreman in charge of Distribution, Site, Communications System Installation
Intel Ocotillo Campus – General Foreman in charge of Installation of 35KV Distribution System for Fab 52.1 & 52.2
Estimator for Sturgeon Electric
Salpointe High School – Foreman in charge of the new Performing Arts Center Building Addition
Iron Mountain Data Center AZP-2 – Foreman – Installation of Lighting System on Level 1 & 2.
University of Arizona – Foreman - Remodel Project for the East Sideline project.
University of Arizona – Apprentice - Installation of Distribution equipment and feeders for the University of Arizona Scoreboard