Adept at steering complex projects to success, I leveraged project management and root cause analysis skills at Yokogawa Middle East, enhancing project delivery by prioritizing cross-functional team collaboration. My proactive approach and ability to drive project planning and development have consistently resulted in meeting organizational goals, showcasing my leadership and analytical prowess.
-Attended KOM, System Architecture design, System Hardware design for DCS and Project Engineering Activities.
-Compliance with Project Specifications and ADNOC ONSHORE standards
- Site Survey of Phase-1 Qusahwira site and having equalization workshop with operation/maintenance.
-Leading project prototype cabinet design, manufacturing, inspection with operation and maintenance and successful completion of prototype
-Preparing technical queries with respect project specification. Review of all design deliverables prior to submission.
-Co-ordinating and Leading Hardware Freeze meeting as per project requirement
-Complete Engineering, Pre-FAT and FAT. Reviewing FDS.
-Complete Console design, Cabinet design for MCR, Well PADs, New ITR and GS-2.
-Liaison with Project Document Controller for maintaining Vendor Document Register List
.
-Supporting Project Manager and Planning Engineer in preparing Project
Schedule.
-Preparation of Technical Specification and Request for Quotations for various materials.
-Expediting with various vendors in procurement of materials.
-Coordinating with Yokogawa inter-departments as necessary (Procurement, Logistics, Quality, etc.) to expedite the project activities.
-Complete co-ordination with EPC/ADNOC for Remote FAT Arrangement from Mar-2020 to July-2020. Remote FAT is successful with the satisfaction from EPC/ADNOC.
-Adhering to the Project Schedule, Quality Plan and OHSE Plan, as applicable.
-Attended KOM, System Architecture design, System Hardware design for DCS, Prototype cabinet design and Project Engineering Activities.
-Compliance with MAC Feed Project Specifications and ZADCO off shore standards
-Leading project prototype cabinet design, manufacturing, inspection with operation and maintenance and successful completion of prototype.
-Foundation Field bus design, FF Junction Box and Valve Coupler Junction Box design
-Preparing technical queries with respect project specification. Review of all design deliverables prior to submission.
-Complete Engineering, Pre-FAT and FAT. Preparing & Reviewing FDS.
-Complete Console design, Cabinet design for all four Islands.
-Co-ordinating and Leading Hardware Freeze meeting as per project requirement
-Liaison with Project Document Controller for maintaining Vendor Document Register List
.-Supporting Project Manager and Planning Engineer in preparing Project
Schedule.
-Preparation of Technical Specification and Request for Quotations for various materials.
-Expediting with various vendors in procurement of materials.
-Coordinating with Yokogawa inter-departments as necessary (Procurement, Logistics, Quality, etc.) to expedite the project activities.
-Adhering to the Project Schedule, Quality Plan and OHSE Plan, as applicable.
Project Role Title: Senior Project Engineer
· Attending Kick-off meeting for the project, project review meeting and discussing technical scope of work for the project.
· Leading multiple projects with allotted team members to achieve OTTR, RPI, and less Rework Hrs parameters of the department.
· Responsible to deliver project scope engineering documents such as FDS, DDS, Cabinet Design, Wiring database, loop drawings, FAT/SAT procedures, Application programs etc.
· Responsible for conducting FAT/SAT with team members for customer satisfaction.
· Analyzing logically and analytically global customer needs in projects & fulfilling their requirements to improve Productivity and Growth.
· Coordinating with various Honeywell entities Middle East and USA for global project execution.
· One of the active members in Process Owner Group of Global department where in all Quality of project process documents will be verified and discussed like Checklist etc. One of the active department internal Auditor.
· In GES, led new initiative of supporting Domestic Customer also. This domestic channel is developed in GES to develop business.
· Providing technical estimation to sales team for the projects.
· Responsible for KAIZEN, and 5S activities in department. They lead to add small improvements in existing process or document.
Control Logic PLC, RSView 32 Graphics.
· Implemented Control logic PLC code in Ladder and FB for the Power Plant process.
· Conducted FAT/SAT for the control logic system.
· Control Net configuration is done for I/O racks using RsNetwork.
· The communication between Control logix PLC is achieved using Ethernet
Handled alone SAT for three Control logic PLC for boiler operation. Co-ordination with project consultant and end-user for smooth SAT completion.
Project Role Title: Project Engineer
Control Logic PLC
· Involved in this project from PLC design, configuration and PLC code implementation in Ladder for Oxygen Separation Plant.
· Conducted FAT for this application with customer satisfaction.
· This process system is controlled with Control Logix PLC with RSview-32 HMI. Remote I/O s and HMI communication is through Control Net.
· Responsible for maintenance of Oxygen Plant instruments such as Pressure Transmitter, Control Valve, SOV, Pressure Switches, Pumps and HT motors and MCC panels.
· Responsible for maintenance of Oxygen plant GE-Fanuc System and Complicity SCADA system.
· Planning and executing Preventive maintenance and shutdown maintenance activity. Documenting maintenance records, Calibration certificate for Quality purpose.
· Worked in SAP R/3 modules for PR rising, material reservation from Store.
Coordinating with Purchase group/vendor to evaluate technical specification of the intended Spare material.
Project Management
Project Planning
Project planning and development
Project tracking
Root Cause Analysis
PMI Certified Project Management Professional (PMP®)
PMI Certified Project Management Professional (PMP®)