Summary
Overview
Work History
Skills
Timeline
Generic

Nicholas Iezzi

Mesa,AZ

Summary

Responsible Foreman with excellent project oversight, team management and blueprint interpretation skills. Coupled with more than 7 years of experience. Achieves project milestones and adheres to deadlines and quality standards.

Overview

9
9
years of professional experience

Work History

Foreman

JD Steel
02.2023 - Current
  • All of the same responsibilities of previous employer although here at JD we take on much larger projects.
  • Leader in PT cable reinforcement projects overseeing up to 30 employees.
  • Responsible for decks passing inspection.

Foreman

Kings Of Rebar
06.2015 - 01.2023
  • Interacted with employees to demonstrate high standards and mitigate issues effectively.
  • Established clear priorities and production quality standards.
  • Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Reworked positions and workflow based on individual abilities and production targets.
  • Checked equipment to determine if maintenance was required.
  • Verified completed projects met approved time, quality and cost estimates.
  • Meticulously tracked parts and equipment used on each job site.
  • Wrote daily production reports to help senior leadership make accurate operational plans and decisions.
  • Completed final walkthroughs at job sites to close out projects.
  • Worked alongside team to accomplish work goals according to schedule.
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
  • Assigned daily duties to each employee based upon individual strengths.
  • Worked from ladders, scaffolds, and walls to install rebar
  • Complied with OSHA and company safety guidelines for height safety, lock out tag out, confined space and hazardous material handling.
  • Determined size, shape, placement and material of supports based on blueprints and structural standards.
  • Positioned rebar and other iron reinforcement following pouring of concrete.
  • Reviewed work plans and blueprints to ascertain all requirements for project.
  • Inspected projects, identified issues that occurred and implemented corrective measures.
  • Operated Forklift on daily basis.

Skills

  • OSHA 30 certified
  • Job Site Preparation
  • Reinforced Steel
  • Critical Thinking
  • Tools and Equipment
  • Maintaining Clean Work Areas
  • Corrective Actions
  • Blueprint Reading
  • Basic Mathematics
  • Project Leadership
  • Rebar Cutting
  • Hand and Power Tools
  • Protective Equipment Knowledge
  • Self Control and Integrity
  • Construction Knowledge
  • Vehicle Loading and Unloading
  • Attention to Detail
  • Forklift certified
  • Rigging certified

Timeline

Foreman

JD Steel
02.2023 - Current

Foreman

Kings Of Rebar
06.2015 - 01.2023
Nicholas Iezzi