Summary
Overview
Work History
Education
Skills
Websites
Accomplishments
Certification
music, walking, films, reading
Languages
Timeline
Generic

Parviz Babayev

Baku

Summary

PARVIZ BABAYEV PERSONAL PROFILE

Extremely hard working, dedicated, tenacious and energetic with good interpersonal skills. Capable team leader and /or team player, negotiator

Overview

23
23
years of professional experience
1
1
Certification

Work History

DEPUTY CHIEF ENGINEER

CASPIAN PIPE COATINGS LLC
10.2022 - Current
  • KAZAKSTAN 1BCMA PROJECT, AZERTEXNOLAYN 40 INCH 3LPE,
  • Manage and lead Production, Technical and Pipe handling departments
  • Organize and manage all site activities
  • Mobilization, Construction and Demobilization of new PUF and HDPE plant on site
  • Preparation of Technical part of Tender packages
  • Organizing and managing preventive maintenance activities in plant and rolling stock
  • Managing Reconstruction of Plant conveyor for long length and high OD pipes
  • Creating of technical procedures
  • Evaluation of Process performance and providing proposals to increase efficiency
  • Acting as COMPANY interface in technical matters
  • Interface with Customer, COMPANY departments, Suppliers and Sub contractors.

QUALITY CONTROL MANAGER

CASPIAN PIPE COATINGS LLC
01.2016 - 01.2022
  • BP SHAH DENIZ STAGE 2, BP, , BP SCPX , TOTAL ABSHERON EPS, BP CGLP, BP ACE, UBOK UMID ,SOCAR PROJECTS.

- Manage and lead QC and Pipe Tracking departments

- Review Tender Bid Package and provide required data and reports for Bid Package.

- Interface with Customer, COMPANY departments, Suppliers and Sub contractors.

- Responsible for setting up and monitoring systems to control the quality of products

- Manage and coordinate quality control programs designed to ensure continuous quality production.

- Developed analysis components of data in order to determine quality standards are followed and maintained.

- Maintain quality control objectives and coordinate with managers the production procedures to maximize quality and reduce costs.

- Measuring performance against in-house and external standards

- Select the supervisory, competent suitably trained personnel for the scheduled and non scheduled inspection activities

- Ensures anode welding and pin brazing inspections and NDT tests carried out according to specification and standard requirement.

- Ensure the safe use of all testing equipment

- Monitor and evaluate the performance of subordinates.

- Looking at any areas of weakness and recommending ways to improve

- Prepare the“As built” data for projects;

QUALITY CONTROL REPRESENTATIVE

TWI
01.2017 - 01.2017
  • BP SCP PROJECT
  • INSTALLATION OF SLEEVES AND VALVES ON BAKU-TBILISI-ERZURUM GAS PIPE LINE-, Review and comment on documentation
  • Inspection of consumable and test equipment certificates
  • Inspection of welding equipment
  • Inspection of flanges
  • Fit up inspection of flanges
  • Welding preparation inspection
  • Inspection of welding process as per approved WPSs
  • Preparing and submitting inspection reports

ACTING QUALITY CONTROL MANAGER

CASPIAN PIPE COATINGS LTD
01.2014 - 01.2016
  • BP SHAH DENIZ STAGE 2, BP
  • Performing all duties of QC Manager

DEPUTY QUALITY CONTROL MANAGER

CASPIAN PIPE COATINGS LTD
01.2010 - 01.2013
  • Manage and lead QC and Pipe Tracking departments
  • Review Tender Bid Package and provide required data and reports for Bid Package
  • Interface with Customer, COMPANY departments, Suppliers and Sub contractors
  • Responsible for setting up and monitoring systems to control the quality of products
  • Manage and coordinate quality control programs designed to ensure continuous quality production
  • Developed analysis components of data in order to determine quality standards are followed and maintained
  • Maintain quality control objectives and coordinate with managers the production procedures to maximize quality and reduce costs
  • Measuring performance against in-house and external standards
  • Select the supervisory, competent suitably trained personnel for the scheduled and non scheduled inspection activities
  • Ensure functionality of PTS database
  • Coordinate and supervise quality tests on all samples
  • Coordinate concrete coated pipes stripping activities
  • Organize the Inspection and test activities in accordance with project requirement
  • To familiar with and to maintain awareness of Caspian Pipe Coatings Management System requirements
  • Carry out all laboratory testing
  • Ensures tests and inspection equipment used during tests are calibrated and in date
  • Ensures anode welding and pin brazing inspections and NDT tests carried out according to specification and standard requirement
  • Prepare comprehensive laboratory test results on all tests performed
  • Report any anomalies in test samples to Management and investigate the reasons
  • Ensure the safe use of all testing equipment
  • Monitor and evaluate the performance of subordinates
  • Looking at any areas of weakness and recommending ways to improve
  • Prepare the “As built” data for projects;, BP COP PROJECT, SOCAR

QUALITY CONTROL COORDINATOR

CASPIAN PIPE COATINGS LTD
01.2008 - 01.2010
  • BP PRODUCED WATERLINE PROJECT
  • SOCAR NEFT DASHLARI (OIL ROCKS) - BAHAR GAS PIPELINE PROJECT
  • BAKU

QUALITY CONTROL SUPERVISOR

CASPIAN PIPE COATINGS LTD
01.2006 - 01.2008
  • BP PRODUCED WATERLINE PROJECT
  • SOCAR NEFT DASHLARI (OIL ROCKS) - BAHAR GAS PIPELINE PROJECT.

PIPE TRACKING SYSTEM SUPERVISOR

EUPEC PIPE COATINGS AZERBAIJAN LTD ACG
01.2003 - 01.2006
  • Maintaining the trace ability of each line pipe from receipt by to load out by railroad or sea
  • Fulfilling the need to supply the coating plants with correct quantities and sizes of line pipe, whilst supporting the requirement of Pipe Lay Barge
  • Making sure that the data during the production progress is updated properly by the stations involved into the production progress
  • Maintaining a weekly reconciliation report and S-Curves for Customer review
  • Preparing documentations for As Built Dossier
  • Liaising with the Customer to provide logistical support to multiple users
  • Preparing the Corrosion Coating Reports on the daily, weekly and monthly bases, submitting them to the client for the final approve, controlling all coating records
  • Preparing and checking the Load-Out Reports for each vessel that the pipes were loaded out by, solving any problems occurred on the reporting concerning the load out
  • Submitting the CD including the full pipe details to barge prior to pipes are loaded out for each item coated
  • PIPE LINE PROJECT
  • PHASE 1 AND 2
  • SHAH DENIZ” GAS EXPORT PROJECT
  • BTC (BAKU-TBILISI-CEYHAN PROJECT)
  • BP EXPLORATION
  • AZT SANGACHAL INTERCONNECTING PIPELINE
  • BAKU, TALLY MAN / QUALITY CONTROL
  • Preparing the Corrosion Coating Reports on the daily, weekly and monthly bases, submitting them to the client for the final approve, controlling all coating records
  • Preparing and checking the Load-Out Reports for each vessel that the pipes were loaded out by, solving any problems occurred on the reporting concerning the load out
  • Submitting the CD including the full pipe details to barge prior to pipes are loaded out for each item coated
  • Preparing the Material Release Request Reports for any line pipes have been loaded in from the rail cars or vessels
  • Preparing the Material Tickets for any line pipes have been dispatched via trucks
  • Maintaining direct interface on the reporting with the Quality Department
  • Liaising with the Customer
  • Implementing HS& E policies of both Eupec and BP Arranging yard storage for the multiple handling of over 95,000 line pipes
  • Planning and organizing the night shift activities and feeding the night shift with proper information
  • Submitting the night shift activity report to the PTS Department and Logistics Department regarding the pipe movement via e-mails
  • Coordinating of pipe movement activities;
  • Coordinating of pipes load-in inspection activities;
  • Coordinating and reporting of Load-Out and close cooperation with MCCI QA/QC;
  • Coordinating with the HS&E Department on all safety and environmental issues;
  • Supervising and reporting of concrete coated pipes stripping activities;
  • Pipes cutting and respective QC Inspection;
  • Steel damage inspection and follow-up;
  • Corrosion Coating Inspection
  • Concrete Weight Coating Inspection;

OPERATOR

AZPETROL OIL COMPANY
01.2001 - 01.2003
  • Carried out the organization of sales activities in addition with the maintenance of the equipment being used in the petroleum station, coordinating the activities of the pump guys in the station.

Education

High School Diploma -

Baku Turkish Anatolian High School
Baku, Azerbaijan
1997

Bachelor of Science - English Language Teaching

Azerbaijan University of Languages
Baku, Azerbaijan
06.2001

Petroleum Engineering

BAKU HIGHER OIL SCHOOL
Baku,Azerbaijan
06.2024

Skills

  • Problem solving
  • Creating free communication for team
  • Trainer
  • Data analyzer
  • Team organizer
  • Motivator
  • Empowering team
  • Proactive
  • Managing projects in tight timelines
  • Conflict management
  • Time management

Accomplishments

  • Birth date and place: 1st June 1980, Qafan city, Armenia SSR
  • Nationality: Azerbaijany
  • Gender: Male, Certificate of Achievement
  • ISO 9001-2015 and ISO 14001-2015 Internal Auditor
  • Certificate of Achievement – Netzsch DSC 214 calibration, Thermal Analysis, Cp Testing, OIT Test
  • Practical Training in EUPEC CWC Coating plant in Mukran Germany, EUPEC External and Internal Pipe CC Coating , Insulation coating, Bends and Riser coating, CWC Coating plants in Dunkirk France
  • Practical Training in Showcor - Batam and Rasalkaimah pipe coating plants
  • Certificate of Achievement on Multi Layer Polypropylene(MLPP) and Glass Flake Polypropylene Insulation process by Showcor (Channelview, Houston, USA)
  • ISO 9001:2015, ISO 14001:2015 and OHSAS 18001: 2007 (March-April 2009) – Certificate of Internal auditor for QOHSE Management System
  • Driving License - Categories B and C

Certification

NACE CIP 3 Certificate of Achievement NACE CIP 2 Certificate of Achievement Thermal 5Layer MLPP Process by Shawcor-Certificate of Achievement, USA, Houston Certificate of Achievement. Pipeline Coatings Inspector; ICORR (Level 2), Institute of Corrosion, ICORR Test Center, Rotterham, UNITED KINGDOM, 2007 (passed in Baku, AZERBAIJAN). Certificate of Achievement. CSWIP-3.1 - Visual Welding Inspector - Level 2

music, walking, films, reading

Listening music

Walking in nature

watching films

Reading stories

Languages

Azerbaijani
Native language
English
Advanced
C1
German
Elementary
A2
Turkish
Proficient
C2
Russian
Elementary
A2

Timeline

DEPUTY CHIEF ENGINEER

CASPIAN PIPE COATINGS LLC
10.2022 - Current

QUALITY CONTROL REPRESENTATIVE

TWI
01.2017 - 01.2017

QUALITY CONTROL MANAGER

CASPIAN PIPE COATINGS LLC
01.2016 - 01.2022

ACTING QUALITY CONTROL MANAGER

CASPIAN PIPE COATINGS LTD
01.2014 - 01.2016

DEPUTY QUALITY CONTROL MANAGER

CASPIAN PIPE COATINGS LTD
01.2010 - 01.2013

QUALITY CONTROL COORDINATOR

CASPIAN PIPE COATINGS LTD
01.2008 - 01.2010

QUALITY CONTROL SUPERVISOR

CASPIAN PIPE COATINGS LTD
01.2006 - 01.2008

PIPE TRACKING SYSTEM SUPERVISOR

EUPEC PIPE COATINGS AZERBAIJAN LTD ACG
01.2003 - 01.2006

OPERATOR

AZPETROL OIL COMPANY
01.2001 - 01.2003

High School Diploma -

Baku Turkish Anatolian High School

Bachelor of Science - English Language Teaching

Azerbaijan University of Languages

Petroleum Engineering

BAKU HIGHER OIL SCHOOL
NACE CIP 3 Certificate of Achievement NACE CIP 2 Certificate of Achievement Thermal 5Layer MLPP Process by Shawcor-Certificate of Achievement, USA, Houston Certificate of Achievement. Pipeline Coatings Inspector; ICORR (Level 2), Institute of Corrosion, ICORR Test Center, Rotterham, UNITED KINGDOM, 2007 (passed in Baku, AZERBAIJAN). Certificate of Achievement. CSWIP-3.1 - Visual Welding Inspector - Level 2
Parviz Babayev