Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jose Osorio

Mesa

Summary

Adept at enhancing production processes and ensuring product quality assurance, my tenure at Suntec Concrete showcased my ability to innovate finishing techniques and streamline operations. Leveraging skills in finishing chemicals and materials alongside a commitment to safety regulations compliance, I consistently delivered superior results, contributing significantly to project success and efficiency.

Skilled production worker with background in diverse manufacturing environments. Possess strong understanding of production processes and quality control measures, ensuring efficient workflow and adherence to safety protocols. Demonstrated ability to troubleshoot equipment issues and implement process improvements, resulting in enhanced operational efficiency. Committed to maintaining high standards of workmanship and contributing positively to team dynamics.

Overview

5
5
years of professional experience

Work History

Finisher

Suntec concrete
Phoenix
08.2020 - Current
  • Coordinated with other departments to ensure seamless production flow.
  • Installed hardware such as hinges, locks, catches and fasteners onto furniture pieces according to instructions.
  • Reviewed all reports available to control costs, schedule work and eliminate shortages.
  • Utilized hand tools and equipment for detailed finishing work.
  • Assisted in the development of new finishing methods and techniques.
  • Verified dimensions of parts with calipers, micrometers, rulers and other precision measuring instruments.
  • Measured and weighed items to meet quality standards and prevent waste.
  • Separated products according to weight, grade and size of material to produce final product.
  • Adjusted finishing techniques based on material types.
  • Prepared and treated surfaces before applying finishes.
  • Stored finished products securely until delivery is scheduled.
  • Followed daily preventive maintenance schedule for cleaning and lubricating machinery.
  • Managed inventory of finishing supplies and materials.
  • Inspected products for defects in workmanship or materials prior to completion.
  • Assembled components using hand tools and power tools in accordance with blueprints or drawings.
  • Constructed forms to create various concrete structures.
  • Cleaned work area at end of each shift removing debris, unused material.
  • Troubleshot equipment issues and determined best courses of action for repairs.
  • Inspected work sites to ensure that all safety protocols were followed.
  • Created requested finishes and results using small gravel for pebble appearance and other techniques.
  • Prioritized tasks for each job after reading project blueprints and documents.
  • Placed steel pins using sledgehammer.
  • Finished surfaces by hand-troweling or machine-troweling for a smooth finish.
  • Inspected and maintained tools and equipment.
  • Set up scaffolding, braces, and other temporary structures to support crew during work.
  • Built forms to specific dimensions to shape wet concrete.
  • Operated power vibrators to compact concrete into place.
  • Mixed, poured and spread concrete using a variety of tools including trowels, floats and screeds.
  • Spread, leveled and smoothed concrete using rake or shovel.
  • Ensured that proper grades were maintained throughout the project for drainage purposes.
  • Positioned wire mesh and rebar to reinforce concrete.
  • Compacted grade using jumping jack or plate compactor equipment.
  • Produced rough concrete surface using brooms.
  • Protected surfaces from avoidable damages by using correct forming, bracing, preparation, and finishing techniques.
  • Sprayed curing compound on newly finished surfaces as needed.
  • Dismantled forms using basic and advanced tools.
  • Maintained inventory list of items used on job sites to provide reordering details.
  • Signaled truck driver to pour concrete and move chute, directing concrete on forms.
  • Measured and cut reinforcing steel bars in order to reinforce the structure.
  • Followed instructions given by supervisors regarding job requirements such as depth and width measurements.
  • Finished surfaces by troweling, floating and brushing following project requirements and specifications.
  • Maintained safety of work areas by adhering to strict regulations.
  • Installed expansion joints, sealants, coatings, and other protective treatments according to specifications.
  • Removed debris and waste to clean site after completing work.
  • Mixed and poured concrete according to standard ratios.
  • Leveled and smoothed freshly placed concrete with a straight edge or float.
  • Used forklifts and other equipment to move materials and complete project work with construction team.
  • Set concrete forms to desired pitch and depth and aligned.
  • Worked with teammates to move steel forms.

Education

High School Diploma -

Mesa High School
Mesa, AZ
05-2017

Skills

  • Finishing chemicals and materials
  • Product quality assurance
  • Production processes analysis
  • Safety regulations compliance

Timeline

Finisher

Suntec concrete
08.2020 - Current

High School Diploma -

Mesa High School
Jose Osorio