Detail-oriented Piping Inspector with experience in shop fabrication, site installation,line checking,hydro-testing, pre commissioning and commissioning for various construction projects in Oil & Gas sector. Very well experienced in preparation of Hydro-Test Packages, control of all stages of Test Packs: in control of punch clearness, hydro-test preparation, pressure testing, reinstatement stage; in handover of the completed lines to Client company according to piping systems. Familiar with codes and ASME standards. Able to maintain or enhances the self-esteem of other team members to ensure that everybody can mediate problems within team.
Seeking to use proven project management and construction skills to improve quality, cost, and time metrics.
Quality management professional with history of driving process improvements and ensuring compliance with stringent quality standards. Proven ability to collaborate effectively with cross-functional teams and achieve significant results. Known for reliability and adaptability in dynamic environments, with strong skills in process optimization and quality assurance.
•Implemented a robust quality control system that reduced product defects by 30%, leading to a significant increase in customer satisfaction and retention. •Managed a team of quality control inspectors, fostering a culture of continuous improvement that resulted in a 20% increase in operational efficiency. •Introduced advanced statistical analysis techniques for quality control, which reduced the time taken for data analysis by 40% and improved the accuracy of quality reports.
• Performed internal and external off stream equipment inspections on Distillation Towers, Heat Exchange's, Furnaces, and Condensers during the 2024 plant turnaround.
• Familiar-ed with isometric drawings and creation.
• Commended for outstanding job performance by Contractor Client.
• Performed off stream equipment inspections of distillation towers, heat exchange's, furnaces, storage tanks, condensers, and reactors.
• Reported any unsafe acts or practices within the facility.
• Met production and quality goals each day.
• Verified material conformity and also witnessed loading and installations tests on mechanical, rotating, structural and piping equipment.
• Inspected and verified the welded connection both internally and externally to ensure that it is compliance with the specific code.
• Performed Visual inspection on valves, pumps, tanks, piping, and pressure vessels in-service.
• Identified Non-conformance when it occurs and facilitate timely solution Documents inspection results by completing reports and logs.
• Performed in process weld inspection, preparation of visual acceptance report and requisition for NDT as per project drawing specification.
•Maintained accurate records of inspected items, tracking defect trends and contributing to ongoing process improvements.
• Checking the Inspection Test Plans (ITP) and Quality Record (QR) in accordance with, ASME Sections and to fulfill the requirements of Client job Specifications.
• Inspection of piping activities like Flange Face inspection, Valve installation, gasket & bolt as per drawing prior to installation.
• Line inspection after the construction activities.
• Preparing the weld history according to the NDT requirements and project specification.
• Counter checking the fabrication Isometric Drawing with GA and P&ID.
• During line checking, the incomplete works to be noted in the punch list as per the categories “A”, inspector has to prepare the punch list, each and every incomplete items to be written in the punch list.
• As per isometric and P&ID drawing, line inspection and making punch list.
• Assure that all pipe supports are properly installed of correct type and material.
•Conducted regular surveillance and monitoring activities to identify possible leaks or damage in pipelines.
• Checking the Inspection Test Plans (ITP) and Quality Record (QR) in accordance with, ASME Sections and to fulfill the requirements of Client job Specifications.
• During line checking, the incomplete works to be noted in the punch list as per the categories “A, B”, inspector has to prepare the punch list, each and every incomplete items to be written in the punch list.
• Closing of punch list before/after the pressure test on completed pipelines.
• As per isometric and P&ID drawing, line inspection and making punch list.
• Assure that all pipe supports are properly installed of correct type and material.
• Reviewing the documentation and maintaining the documents to get the clearance before hydro/pneumatic test.
• Witness progressive internal cleaning / air blowing inspection during installation of pipe spools.
• Inspection of piping activities like Flange Face inspection, Valve installation, gasket & bolt as per drawing prior to installation
• Conduct inspection for piping pre installation inspection according to its Process Flow Diagram PFD, P&ID, Plot Plan drawings, Piping Isometric drawing , Hydrostatic pressure test diagram, Pipe Support and Foundation location drawing pipe support and anchor detail drawings project scope of work and project specifications requirements.
•Increased accuracy of inspection data by utilizing cutting-edge measurement tools and techniques throughout the process.
• developing and implementing quality standards.
• inspecting and testing materials ,equipment, processes and products to ensure quality specifications are met
• inspecting and testing materials ,equipment, processes and products to ensure quality specifications are met
• Developing and implementing quality control systems
• Monitoring and analysing quality performance.
• Regulation and Controlling QA/QC activities during Pre-commissioning and Commissioning period
• Develop and initiate quality standards for tests, inspections and evaluation
• Maintain, monitor and ensure highest quality in services or products.
• Design and develop forms and instructions for evaluating,assessing, reporting and documenting on quality standards in products or services
•Checking the Inspection Test Plans (ITP) and Quality Record (QR) in accordance with, ASME Sections and to fulfill the requirements of Client job Specifications.
•QA/QC Pipe inspector test pachk controller
•Review piping design as per codes and standards, project specifications and client requirements
•Conduct inspection for piping pre installation inspection according to its, P&ID, Isometric drawing, Hydrostatic test drawing, Pipe Support drawings project scope of work and project specifications requirements.
•Counter checking the fabrication Isometric Drawing with P&ID.
•Inspection of piping activities like Flange Face inspection, Valve installation, gasket & bolt as per ISO drawing
•Submit inspection punch list clearing in order to close some categories such as A & B Items that will affect the holding over of dossier prior to start commission.
•EDR/EIR preparation and initiate corrective / preventive actions and ensure that NCR is closed out. Conducting final walk-down punch listing prior to release for pressure testing.
Complete punch listing of installed pipe work and clear any items. Perform piping reinstatement check.
•Preparing the Punch items for each pressure test packages related to piping and tie-in activities.
•Witness progressive internal cleaning / air blowing inspection during installation of pipe spools
Preparation of inspection reports, line checking, and punch lists and all related documents for final acceptance.
•Examining the quality of carried out works and installation as per drawing/ standards.
•Assist in preparing Quality Procedures and Test Packages.
•Preparing As-built drawings as per site condition.
•Submit inspection punch list clearing in order to close some categories such as A & B Items that will affect the holding over of dossier prior to start commission.
•Assist in preparing Quality Procedures and Test Packages.
•Monitoring and managing site work progress according to the work schedule.
•Inspection of pipe line, spools as per isometric drawings.
•Verify and inspects the fittings, gaskets, valves and flanges, as per specification and bill ofmaterials.
•Visual inspection of flanges, gaskets, and bolts, prior to installation.
•QA/QC Pipe inspector test pachk controller
•As built red mark ups are prepared at site for isometric drawings and piping layouts.
•Knowhow of the project drawings like P&ID’s, Piping specifications and Construction scope of work.
• Preparation of “As Built” drawings.
• Preparation of field piping system test packages, including system limit on P&ID and piping Isometrics.
• Responsible for preparing as-built drawing of modified lines as per site actual condition requirements and take the approval from Design Engineering Section.
• Inspect the pipes and piping materials as per specification.
• Inspected, maintained, and operated facilities including pipelines, valves, filters, pumps, gas compressors, storage tanks, and pump station equipment in a reliable and efficient manner while in compliance with the Partnership’s procedures and regulatory requirements.
Boxing, swimming,
I carefully evaluate conditions and processes, utilizing my strong observational skills to offer practical solutions after thoroughly analyzing the details.
I take a hands-on approach, providing productive consultations with clients and subcontractors, while fostering effective teamwork and collaboration.
I thrive in a team environment, cultivating positive relationships with my colleagues and offering support to those I oversee, always aiming to maintain a comfortable and efficient workplace.
During emergencies, I remain calm under pressure, act decisively, and make prompt and accurate decisions to ensure smooth operations. These attributes are essential for maintaining productivity in high-pressure situations.